Exhaust gas Systems
Exhaust gas systems for combinet cycle power stations
RAUMAG – JANICH undertakes to supply the complete exhaust gas system for combined cycle power stations, comprising:
- diverter,
- silencer,
- bypass stack and stack support structure diffuser after turbine
- guillotine ahead of steam generator (optional)
- flue gas duct ahead of steam generator (optional)
- stack damper (optional)
Combined cycle power station with bypass system.
Bypass system.
GUD power station ENTEK (Turkey) with bypass- system and DIVERTERDN 3050 x 3050 mm.
BYPASS- SYSTEM with DIVERTER DN 5600 x 5600 mm off the TISHREEN combined cycle power station, Syrien.
BERTSCH Boiler with 2 DIVERTERS DN 3050 x 3050 mm and the duct system from RAUMAG- JANICH of the combined cycle power station HÖCHST,Germany.
BYPASS- SYSTEM and DIVERTER DN 3050 x 3050 mm for the combined cycle power station BRAUNSCHWEIG, Germany.